Voltage Optimisation Case Studies
Heinz
Annual Savings Achieved
• £14,406.00
• 58.34 tons CO2
Payback
• 1.8 years
Benefits
• Reduction in energy costs
• Improved Efficiency
• Removal of reactive power charges
Frankie & Benny's
Annual Savings Achieved
• £4,120.00
• 23.7 tons CO2
• 12.8% energy saving
Payback
• 1.8 years
Benefits
• Immediate cost saving
• Reduction in maintenance
• Fast return on investment
DW Sports Fitness
Annual Savings Achieved
• £11,111.00
• 14.18% saving
• 63.92 tons CO2
Payback
• 19.7 months (< 2yrs)
Benefits
• Removal of reactive power charges
• Reduction of 63 amps per phase
• Reduction of 45 kVa demand
• Improved utility